Product Details:
Payment & Shipping Terms:
|
Shape: | Octagonal | Type: | Burial Type |
---|---|---|---|
Material: | Q345 | Voltage: | 15kv |
Thickness: | 3mm | Design Load: | 500kg |
Highlight: | electrical service pole,power transmission poles |
We can design products as customers' demand or manufacture for you if you have pictures or drawing.
Also, if you want to consult the price, please provide the drawings so that we can tell you the price quickly and accurately.
Material
Applied to the material of general-purpose steel GB/T1591-2008, Q235, Q345, Q420, Q460 used in China.
1.All of our material are purchased from famous mill factory to assure the quality.
2.A mill certificate issued by the mill factory with stamp and signature must be provided before unload the material in our factory ,otherwise we have our reason to refuse the material.
3.Before put into production ,all the material must pass the chemical and physical analysis to make sure that they have meet the requested strength and component.
Steel Pole of National Electrification Administration (Philippines)
Specification for Distribution Steel Pole 25FT, 30FT, 35FT, 40FT, 45FT
Height(ft) | Thickness(mm) | Butt Diameter(mm) | Top Diameter(mm) | Design Load(kg) | Yield Stress(MPA) | Zinc Coating(microns) |
25 | 2.5 | 152 | 120 | 300 | 345 | 86 |
30 | 3.0 | 226 | 127 | 500 | 345 | 86 |
35 | 3.0 | 248 | 127 | 500 | 345 | 86 |
40 | 3.0 | 317 | 127 | 500 | 345 | 86 |
45 | 4.0 | 328 | 127 | 750 | 345 | 86 |
Details
Type | Burial Type |
Shape of pole | Octagonal |
Diameter | 127mm / 248mm |
Material | Q345 equivalent to S355JR,Grade 50 |
Thickness | 3.0mm |
Design Load | 500KGS |
Welding | Welding complies with CSA and AWS, AWS D1.1 standard. The welders have got corresponding certificate after testing and inspection. |
Standard | NEA |
Galvanizing | Hot dip galvanization in accordance with Chinese standard GB/T 13912-2002 or American standard ASTM A123. |
Voltage | 15kv |
Fabrication process | Cutting plate, bending ,forming, automatic welding, drilling holes ,quality check before galvanized, hot dip galvanized, final quality check according to client's requirement. |
Our Service
We always insist on one-on-one service to our client since our first contact with our clinet to save our client's time and no need to spend their time to rebuild the trust and relationship with new service personal.
Because of the time difference between us and our client, we do our best to provide 7*24 service to let our clients can contact with us as solve their questions ASAP. The minimum standard we promise you that all your questions can be received our reply within 24 hours.
1. Are you a manufacturer or a trading company?
A:We are the direct factory manufacturer and the trading company.
2. Where is your company located?
A:Our factory is located in Industrial Zone, Heqiao Town, Yixing District, Wuxi City, Jiangsu Province, China(mainland).
3. What are your main products?
A:Our main products are electric poles, street lighting poles, high mast pole, telecommunication tower poles, traffic signal poles, wind generation poles, etc.
4. What's your nearest port?
A: Shanghai Port.
5. What's your payment term?
A: Normally 30% deposit and rest by TT before shipping. Or L/C.
6. What's your delivery time?
A: Normally within 30 working days.
Our Website:http://www.metalutilitypole.com/
Contact Person: Mrs. Lisa Li
Tel: +8613601538657
Fax: 86-510-80321126